The BCS fit was specially developed for wood-fired heating plants that have already been in use for a long time and need a "reboot" in terms of automation technology to make them fit for the future again. Our tried and tested BCS®-Suite (Biomass Control Solution), which implements intelligent control concepts for systems with its various

Data

2025-05-21T10:28:33+02:0017. April 2024|

Sensor data - actions with data Increasing digitalization has also led to extensive data volumes in industrial plants, particularly through the recording of sensor data. This data is valuable - but how can it be used? What makes this sensor data so valuable? Historical sensor data allows us to extend our view from the

HAZOP

2025-05-14T14:24:40+02:0017. April 2024|

Hazard analysis using the HAZOP study - Plant safety in the (wood) industry Plant safety is of paramount importance in every industry, and the timber industry is no exception. In a holistic risk analysis, it is crucial not only to consider the obvious dangers posed by machinery and equipment, but also to comprehensively record and

Facilities at their best – why “service” is a must-have

2025-10-22T13:37:38+02:0028. June 2023|

Especially in today's world, power plants and production facilities face numerous challenges. Be it in terms of efficiency, reliability or environmental compatibility. To meet these requirements, we have the right solution for every need. After implementation, it is important to maintain the delivered content in optimal condition and keep it up and running. Professional

From Austria to Australia…

2025-10-22T13:40:12+02:0011. April 2023|

Technology transfer to Australia There have often been successful exports from Austria to overseas, and one or two of the better-known stories have their origins in Styria. This is also the origin of one of our current orders in this federal state - as a result of one of our successful technology projects. Interested readers will remember the project carried out by VOIGT+WIPP Engineers to modernize the magnesite calcination process at STYROMAG in Tragöß-St. Katharein.

Change with vision

2025-10-22T13:39:16+02:005. April 2023|

For the implementation of the BCSfit project in the district heating plant Innerratschings, this premise applied in a double sense. On the one hand, it took the foresight of plant operator Erwin Schölzhorn and his team to make the decision to make the district heating plant fit for the future with our Biomass Control Solution (BCS). On the other hand, a beautiful panoramic view over the Ratschingstal valley opened up for the VOIGT+WIPP Engineers during an alpine pasture hike.

Maximum site performance with the EPOC® Suite

2025-10-22T13:44:37+02:005. April 2023|

By integrating individual process plants into the higher-level control concept of our EPOC® Suite (Energy & Production Optimization Control), previously unattainable added value can be realized in terms of plant performance and product quality. Flexibility - even in the event of changes at the site - characterizes the new system with which we implement

Relationship stories and service things – It`s all about relationships

2025-10-22T13:46:45+02:005. April 2023|

Just like in "real" life, it is also in business - a good relationship with the customer is the most important thing. If you are "in relationship" with the person on the phone, it is much easier to work more openly and sometimes more critically. It helps to look after your counterpart with a

Bad point control – Intelligent solution for biomass cogeneration plants

2025-09-16T11:52:14+02:005. April 2023|

The low-point control is an intelligent solution package for biomass CHP plants to operate district heating pumps in the optimum efficiency range while minimizing grid losses and electricity costs. Every heat customer in a district heating network requires a pressure difference between the flow and the return at its transfer point to the district heating

Insight Project Norske Skog

2025-10-22T13:50:04+02:005. April 2023|

Conversion projects during ongoing operations always present a major organizational challenge in addition to the technical ones. Under the sign of the pandemic, the challenge was once again much higher this year. We are therefore particularly pleased that we were able to successfully complete the upgrade of the fluidized bed plant at Norske Skog in Bruck on schedule.